Showing posts with label 5G. Show all posts
Showing posts with label 5G. Show all posts

Statutory Objection Notice Phone Mast

The installation of electronic communications apparatus under paragraph 75(2) of schedule 3A of the communications act 2003.


Here is a picture of the rights a person has to object to a phone mast installation once its already been installed at a site. I believe this notice, or a very similar worded one, will or should be present at all public phone mast sites in the UK. It should be visible on the electrical cabinets [those off-white electrical boxes usually at ground level] that power the tower.

Statutory_Objection_Notice_Phone_Mast


This particular notice is from Hutchison 3G UK Ltd ["Three"]. And the site in question is in the UK. Address: Chester Road SW - B35 7EY. Cell reference: BHM654. More in this area. Please see the picture above enlarged at full size [around 1.5mb] to read the whole statement. I left the image big so you can read it quite easily. Open image in new tab.

The networks that use this 5G phone mast are: Hutchison 3G UK LTD ["Three" three.co.uk] and EE LTD.

Basically, if the criteria is met, a person / business / land owner etc has the right to complain [under paragraph 77 of the code] within 12 months of the phone mast being installed. After that time period has gone, it states the circumstances in which a court may uphold an objection are significantly more limited. So, in most cases, after 1 year you're out of luck, and the mast is there to stay.



Trending...